Pacific Telesis Headquarters

High-Rise Exterior Renovation
28 stories, 500,000 square feet
Steel Frame with Terracotta
Masonry Skin
Architect: Garcia Wagner Assoc.


The Pacific Telesis Headquarters Building is a San Francisco landmark. Herrero was hired to inspect and replace the exterior skin on the 28-story structure. The $40 million team partnering project was completed over five years of field construction. The project required inspecting the entire masonry skin of the high-rise then selectively replacing the glazed terra-cotta cladding that had failed or might fall from the building using an innovative seismic masonry epoxy anchoring system.

"The project received Honorable Recognition at the Consulting Engineers Association of California’s 18th Annual Engineer’s Excellence Awards Competition. This award is a tribute to the entire team.”
H.J. Degenkolb Associates, Engineers

Herrero Contractors, Inc: Pacific Telesis Top
< Back | Next >
Herrero Contractors, Inc: Projects
 
  Herrero Contractors, Inc.
2100 Oakdale Ave.
San Francisco, CA 94124
Phone: 415 824-7675
Fax: 415 824-7674